Projects

BPE Projects

Recent Projects:

Quarry - Guildford

We were called in to design, manufacture and install a new control panel to serve additional pumps at a quarry near Guildford. Utilising the very latest inverter technology the system had to be fully compatible with the existing systems. The emergency stop button circuitry was extended through this hostile environment to ensure the safety of the workforce.

Other Projects (Page 3 of 3)

Testing & Inspection

BPE Wimbledon undertake Periodic Testing and Inspection on behalf of our clients and are asked to provide expert opinion.

<< Previous 1 | 2 | 3 

Loading...

Loading...